April to Memorial Day

Opening day: the procedures

Opening day is the spring visit when a drained shore house gets its water, hot water and outdoor shower back, in that order.

Work through these five procedures in order on the first spring visit. The water goes on slowly, leaks are found before guests arrive, and the water heater is only powered once its tank is full. Plan a full day, and stay in the house for at least an hour after the main is open.

Tan brick and stucco house with two wraparound porches, striped awnings next door, in Cape May. Photograph; licence and author on Picture credits.

Run order

  1. OD-1Turn the water back onAbout 1 hour · You · 8 steps
  2. OD-2Find the leaks winter left behind2 to 3 hours, mostly waiting · You · 7 steps
  3. OD-3Restart the water heater30 minutes, plus an hour to heat · You + a licensed plumber · 7 steps
  4. OD-4Open the outdoor showerAbout 30 minutes · You · 7 steps
  5. OD-5Flush out the winter water30 to 45 minutes · You · 6 steps

5 procedures here; 4 of 5 have at least one step that belongs to a licensed plumber or a utility, marked PRO inside the page.